AS-131 Pressure Transmitter

AS-131 0-5V pressure monitoring sensors 4-20ma pressure transmitter RS485

APPLICATIONS
1.Mechanical engineering applicationServomechanismHydraulic pneumatic
2.Measurement of High pressure water jetBarometric pressure
3.Measurement of Pipe pressure
4.General Industrial Control Area


FEATURES
1.Have Wide Range -0.1~0~100MPa made to order
2.A variety of options of Industry standard signal
3.Many Modes of electrical connection

4.A variety of options of Pressure interface
5.Simple shape design,cost-effective

 



Product Paramenters
Range -1~0~1000bar optional
Output 4~20mA, 1-5V, 0-10V, RS485(Customizable)
Accuracy 0.15%F.S,0.25%F.S,0.5%F.S optional
Power supply 12VDC~30VDC/7-30V
Working temperature -20~85℃
Temp Compensation -10~70℃
Response 500HZ
Level of protection IP65
Pressure core diffused silicon, strain type, sapphire
Stability performance ±0.1%F.S/year
Material of the housing 304,316L(customizable)
Process connection default M20*1.5 (customizable)


Package & Shipping:
As a professional electric ball valve manufacturer, COVNA aims to provide our customers the best quality products with the most competitive pricing, on-time delivery and full warranty service with omprehensive service from start to finish, encompassing consultation through to after sales service, full support in every respect and ensure that you are accompanied at each stage of your project.


Company Profile:



Factory Profile:


Company Certificates:


Purchase Guide:
1. How can I get a quote?
Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information.

2. Can I get a quote without drawings?
Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.

3. Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers’ privacy of drawings, signing NDA is also accepted if need.

4. Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible.

5. How about the lead time?
Generally, 1-2 weeks for samples, 3-4 weeks for mass production.

6. How do you control the quality?
* Material inspection--Check the material surface and roughly dimension.
* Production first inspection--To ensure the critical dimension in mass production.
*Sampling inspection--Check the quality before sending to the warehouse.
* Pre-shipment inspection--100% inspected by QC assistants before shipment.

7. What will you do if we receive poor quality parts?
Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap.
More infomation, please send message to us. Quote will be provided within 2 hours! inquiry@covna-china.com

Let’s Help

FAQ’s
Free Consultation